thunderbolt: Tear down inactive DP tunnels when the domain is stopped
No exploitation in the wild has been reported. EPSS puts the chance of exploitation in the next 30 days at 0%. Fixed in Kernel 0b457c6733f73421a3fb03786f13d67c618b5119, Kernel 34a6e27c954e5bfc29fead17867c7155d54b6481 and Kernel cbd2abb85ea32cafdcbaba218e13b18d8ed79bfa.
In the Linux kernel, the following vulnerability has been resolved: thunderbolt: Tear down inactive DP tunnels when the domain is stopped tb_stop() only tears down DMA tunnels so a DP tunnel that is still waiting for dprx_work to complete keeps that work queued while the routers are removed and the control channel is stopped. The work only stops once the DPRX timeout has passed and because it requeues itself until then the flush_workqueue() in tb_domain_remove() won't wait for its final run. The callback then runs against a domain that is already torn down. A reference to that domain is kept so the completion waiting for that domain to disappear in unbind will block until the timeout is eventually reached. Tear down DP tunnels that are not active yet as well which also cancels that work. Tunnels for displays that are already alive are untouched and keep working.
Affected
Vendors, products and packages with version ranges
| Vendor | Product | Versions | Fixed |
|---|---|---|---|
| Linux | Kernel | =6.14, >=d6d458d42e1e1544a18f37f1d5c840e00d5261b9 <0b457c6733f73421a3fb03786f13d67c618b5119, >=d6d458d42e1e1544a18f37f1d5c840e00d5261b9 <34a6e27c954e5bfc29fead17867c7155d54b6481, >=d6d458d42e1e1544a18f37f1d5c840e00d5261b9 <cbd2abb85ea32cafdcbaba218e13b18d8ed79bfa | 0b457c6733f73421a3fb03786f13d67c618b5119, 34a6e27c954e5bfc29fead17867c7155d54b6481, cbd2abb85ea32cafdcbaba218e13b18d8ed79bfa |
Timeline
Every event on this vulnerability
Related
Other vulnerabilities in Kernel, strongest first
Embed
A live severity badge for an advisory, README or ticket